Productive Garden Water Project Procurement

03 Nov, 2017

Productive garden water project procurement in Enonabuasa uses natural spring water that is located 20metre lower than productive garden area. To irrigate water from source to  garden, TLM together with local people use generator set pump machine to  ease and save energy in irrigating horticultural plants in productive garden.

The water infrastructure project covers :

1.Water motor pump (generator set)

2.HDPE pipe and plastic pipe

3.Fiber tank

4.Water tanks

All these intallation process involve local community (10 members of productive garden). This water infrastructure project can fulfill 0,3 acre of productive garden  water need

 

Weir that was not used by villagers before

 

Water tank around productive garden area.

 

Traditional well around productive garden area.

 

Culvert material for well renovation project

 

Well renovation in Enonabuasa

 

Well provided by TLM is ready to be used.

 

Be the first to write a comment.

Your feedback