Productive Garden Water Project Procurement

27 Jun, 2017

Productive garden water project procurement in Enonabuasa uses natural spring water that is located 20metre lower than productive garden area. To irrigate water from source to  garden, TLM together with local people use generator set pump machine to  ease and save energy in irrigating horticultural plants in productive garden.

The water infrastructure project covers :

1.Water motor pump (generator set)

2.HDPE pipe and plastic pipe

3.Fiber tank

4.Water tanks

All these intallation process involve local community (10 members of productive garden). This water infrastructure project can fulfill 0,3acre of productive garden  water need

Unused Weir in Enonabuasa

 

Traditional well in Enonabuasa before renovation

 

Material for well renovation in Enonabuasa

 

Well renovation process in Enonabuasa

 

Well renovation process in Enonabuasa

 

Well renovation process in Enonabuasa

 

Well provided by TLM is ready to be used

 

Water Tank in the garden area

 

 

Be the first to write a comment.

Your feedback